Energy & Utilities

Implementing project management methodologies for Large Infrastructure Projects

Context

A transmission system operators for electricity company, with no specific Project Management (PM) approach in place, needed to develop 4 large infrastructure projects: BOG, Nemo, Stevin and Alegro, at different levels of engagement

Objectives

  • Introduce appropriate governance which offers better transparency and control
  • Introduce a PM methodology based on industry best-practices and enabling the above-described governance

Our Approach

  • Assess the current way of working, design the TO-BE situation, and provide necessary means to bridge the gap between these two
  • Imagine the future situation by defining the governance structure, deliverables models, …
  • Go from the current situation to ideal situation by improving the PM competences and the way of planning and monitoring the projects
  • Assure the sustainability of the developed approach by providing an easily accessible “toolkit” which contains governance guidelines, methodology, and best-practices

Results

  • Identification of a few improvement opportunities
  • Definition of the TO-BE governance structure, roles & responsibilities
  • Gradual establishment of more governance elements. Use of Agile techniques to quickly deliver most urgent BOG project deliverables
  • Set-up of “LIP Toolkit” to ensure easy access and reuse of the methodology on similar future projects

Are you ready to have an impact too?

Join us in shaping meaningful change through innovation, responsibility, and collective ambition. Discover how you can contribute to a more sustainable and impactful future.